Compare a partial drain, full drain, and keeping the water

A 20,000-gallon pool takes about 6 hours and 40 minutes to drain at a steady 50 gallons per minute. Removing just 5,000 gallons takes about 1 hour and 40 minutes at that same flow, before refilling and balancing.

These are calculated examples, not a fixed appointment length. Your schedule depends on how much water needs replacing, the pump's actual flow, and where the water can go. Setup, slower pumping near the bottom, and any cleaning add time.

OptionExample pumping timeWhen it makes sense
Partial drain5,000 gallons at 50 gallons per minute: 1 hour, 40 minutesTesting shows that replacing some water can correct an excessive chemical or mineral level.
Full drain20,000 gallons at 50 gallons per minute: 6 hours, 40 minutesThe planned cleaning or water replacement requires emptying, and conditions allow it.
Keep the waterNo draining or refilling timeFiltration, cleaning, or chemical treatment can correct the problem.

Start with water testing before choosing an option. Pool color alone cannot tell you how much water to remove.

Choose a partial drain when replacing some water is enough

A partial drain removes less water, so both pumping and refilling take less time. It can help when stabilizer or calcium hardness is too high. Stabilizer, also called cyanuric acid, protects chlorine from sunlight. Calcium hardness measures dissolved calcium in the water.

The amount to replace depends on both the pool reading and the refill water. If the replacement water contains none of the substance being reduced, replacing 25% lowers its concentration by roughly 25%. For example, stabilizer at 100 parts per million would fall to about 75 after that replacement. This calculation assumes thorough mixing afterward and no additional stabilizer.

Calcium needs a different calculation because tap water already contains it. In San Diego, Los Angeles, and Orange County, hard source water limits how far a refill can lower calcium hardness. Test the hose water before deciding that a small drain will solve the problem.

Our technicians use those readings to determine the replacement amount. Several small exchanges can take longer overall because each refill mixes with water that remains. They also remove some of the fresh water during the next drain.

A partial drain still needs a safe stopping level. Don't assume that removing a particular percentage is suitable for every pool.

Technician in blue polo crouches at pool edge holding a water sample vial beside a test kit and brush, leaves floating in water.
Need help with your pool?
Request weekly care or an equipment assessment. Review the scope and price before work begins.
See My Price

Choose a full drain only after checking the pool and conditions

A full drain may be appropriate for a substantial water replacement or a planned acid wash. It also creates the longest interruption because the entire volume must go out and come back in.

Emptying a pool removes the weight that helps hold it in place. Groundwater pressure can lift an emptied pool. Recent rain, drainage around the yard, pool type, and groundwater conditions all affect whether draining is appropriate. A dry-looking deck doesn't establish that conditions below the pool are safe.

Vinyl liners and fiberglass pools have additional draining restrictions. Have the pool assessed before lowering the water substantially. A faster pump doesn't reduce these risks.

Heat also affects scheduling. Sacramento Valley summers can exceed 100 degrees Fahrenheit, and inland Southern California runs hotter than the coast. We plan the work and refill together to limit how long the pool remains empty. A mild coastal morning alone isn't enough to approve a drain.

If acid washing is part of the job, allow separate time for that work. The pumping calculation covers water removal only.

Keep the water when cleaning and treatment can fix it

Green or cloudy water doesn't automatically require draining. Algae treatment, debris removal, and restored filtration may address the problem while keeping the existing water.

This option has zero drain time, but it doesn't mean the pool is ready immediately. Treatment time depends on chlorine demand (how quickly the pool uses up chlorine), debris, filter condition, and circulation. Don't plan swimming around a promised number of hours before those conditions are checked.

High pH alone is also not a reason to empty a pool. It can usually be adjusted through water treatment. Likewise, softer refill water in Sacramento and the East Bay can require calcium adjustment rather than further dilution.

If your main problem is recurring green water, start with why your pool keeps turning green. Finding the cause helps avoid spending a day replacing water while leaving a circulation or maintenance problem unresolved.

Calculate drain time using the flow at your pool

Drain time in hours = gallons to remove ÷ gallons per minute ÷ 60.

For a 20,000-gallon drain, a steady 25 gallons per minute takes about 13 hours and 20 minutes. At 50 gallons per minute, it takes 6 hours and 40 minutes. At 75 gallons per minute, it takes about 4 hours and 27 minutes.

Use the flow the setup can deliver, rather than the largest number on the pump label. A long hose, narrow hose, uphill route, or restricted outlet can reduce flow. A pump rated in gallons per hour must have that number divided by 60 before using the formula.

The water outlet can also limit the speed. Before setting up the pump, ask your city or local wastewater agency where the pool water is allowed to go and what it must be like first, for example how much chlorine it can contain. Don't assume a street drain or sewer cleanout is allowed.

Our technicians confirm the pump and hose arrangement after seeing the pool and equipment. Don't assume the existing circulation pump can empty the pool. It can lose its water supply as the level drops, and running dry can damage it. Automatic schedules must also be disabled so equipment cannot start during draining.

The final shallow water may require a different collection method because the drain pump has a minimum operating depth. Leave room in the schedule for that slower finish.

Check refill time before choosing a drain day

Refilling can take longer than draining. At a measured hose flow of 10 gallons per minute, replacing 20,000 gallons takes about 33 hours and 20 minutes. Replacing 5,000 gallons at that flow takes about 8 hours and 20 minutes.

To estimate hose flow, time how long it takes to fill a five-gallon bucket. Divide five by the elapsed seconds, then multiply by 60. A 30-second fill equals 10 gallons per minute. Measure using the hose and faucet setting you plan to use. Two hoses won't necessarily double the flow because they may share the same supply.

Before booking the work, have these details ready:

  • The estimated pool volume and the reason you want it drained.
  • Current pool readings and refill-water calcium hardness.
  • The measured refill flow and a place the drained water is allowed to go.
  • Recent rain, the weather forecast, and any known draining restrictions.
  • A plan to monitor water removal and refilling.

After refilling, the water must reach the proper operating level before circulation restarts. We then check equipment operation and adjust water balance and sanitizer. Swimming should wait until the water is clear, readings are suitable, and chemical label waiting periods have passed.

For scheduling and the factors that affect service cost, see our pool draining and restart service details. Pool volume, access, water disposal, cleaning needs, and restart work determine the scope of the visit.